Construction progress tracking
Compare what was built against what was drawn, weekly.
For: Project managers, quantity surveyors, client representatives
- Weekly
- Verified progress cadence
- 9 days
- Median earlier defect detection
- ±25 mm
- Variance detection threshold
The problem
Progress claims are argued from photographs and a percentage somebody estimated on site. Rework is discovered when the next trade cannot start.
What we do about it
Weekly drone and interior capture registered against the BIM model, with automated variance detection. The claim is supported by geometry, and deviations surface while they are still cheap to fix.
How the work runs
- 1
Establish the baseline
Control network and the federated BIM model as the reference, aligned once and reused every epoch.
- 2
Capture on a cadence
Weekly drone for the envelope, handheld or trolley SLAM for interiors, always to the same registration.
- 3
Detect variance
Automated comparison against the model highlights what is built, what is missing and what has drifted.
- 4
Report to the claim
Progress by element and by trade, exportable into the payment application.
The objection we hear most
“The contractor will resist this.”
The good ones ask for it, because it settles claim disputes in their favour as often as against. The resistance is usually a signal in itself.
Bring us the product you were told could not be configured.
Tell us the option count, the CAD you already have and the frame budget you need to hit. An engineer reads it and replies with a straight answer — including when the answer is that good photography would serve you better.
We reply to every enquiry within one business day, in your timezone — with a frame budget, not a brochure.