Finding the constraint from the doorway
- 31%
- Faster fault localisation
- 6 → 2 wk
- Engineer onboarding
- 17%
- Modelled throughput gain from relayout
Capture
Find the clash in the model, not during the shutdown.
For: Project engineers, EPC contractors, facilities teams
The drawings are from 1998 and three retrofits ago. The new skid arrives, and the pipe run it was designed around moved 400 mm in 2011. The shutdown extends by four days and everyone blames the drawings.
Scan first. A registered point cloud of the actual plant, classified and published as a streamable model, lets the new design be checked against reality before fabrication starts. Clash detection against a cloud is not glamorous and it is the cheapest four days you will ever buy.
Control network first, then terrestrial scans at the required density, drone for anything above roof level or inside a live area.
Bundle adjustment against control, removal of people, vehicles and rain, then classification into ground, structure, equipment and pipework.
Octree publication for the browser, meshed derivatives for the CAD seats, and clash runs against the new design.
The cloud becomes the facility record — the next retrofit starts from reality instead of from 1998.
The objection we hear most
“Scanning a whole plant sounds expensive.”
It costs less than one unplanned shutdown day at most plants. We will tell you what your day rate is before you commit — if the arithmetic does not work, we say so.