Skip to content

Industry

Manufacturing

Discrete and process plants that need the floor legible.

STEPIFCE57OPC-UAglTF
31%
Faster fault localisation
9 days → 9 min
Capital equipment quote cycle
17%
Throughput gain from modelled layout changes

Digital twins, capital equipment configurators and as-built survey for plants where downtime is measured in lakhs per hour.

Manufacturing is where every part of our platform earns its keep at once: the machine is configured in 3D before it is sold, scanned into the twin after it is installed, and supervised through the same scene graph for the next fifteen years. We work with discrete assembly, metal fabrication, textiles and process plants across Gujarat and Maharashtra.

What we usually walk into

  • Quote cycles measured in days for configurable capital equipment
  • Twelve dashboards and no single place the line is visible
  • Drawings that stopped matching the plant three retrofits ago
  • New engineers taking six months to learn the material flow

From the field

A CNC builder in Rajkot went from a nine-day quote cycle to same-meeting quoting, and stopped receiving orders the factory had to renegotiate.

Case studies

Work in manufacturing

CNC machine tool builder, Rajkot · 2025

A nine-day quote cycle, cut to nine minutes

Every machine quote round-tripped through applications engineering because only they knew which spindle, axis and coolant combinations were valid. Nine days elapsed between enquiry and quote. Competitors quoting in two were winning deals on responsiveness alone.

9 min
Quote cycle, was 9 days
3.1×
Quotes per engineer
$4.9M
Change orders avoided in year one
Textile processing group · 2024

Finding the constraint from the doorway

Three plants, twelve dashboards each, and a plant manager who could tell you every machine's OEE but not, on a bad shift, which one was actually constraining output. New engineers took six months to learn the material flow.

31%
Faster fault localisation
6 → 2 wk
Engineer onboarding
17%
Modelled throughput gain from relayout

Bring us the product you were told could not be configured.

Tell us the option count, the CAD you already have and the frame budget you need to hit. An engineer reads it and replies with a straight answer — including when the answer is that good photography would serve you better.

We reply to every enquiry within one business day, in your timezone — with a frame budget, not a brochure.