Industry
Construction & AEC
Progress you can measure and clashes you can find early.
- 9 days
- Earlier median defect detection
- Weekly
- Verified progress cadence
- 11
- Median clashes caught pre-fabrication
Reality capture, BIM variance detection and progress tracking for contractors, developers and client representatives.
Construction generates more 3D data than any other sector and uses less of it. We keep the loop tight: weekly capture, automated comparison against the federated model, and issues raised in BCF while they are still cheap. Interiors go by SLAM trolley, envelopes by drone, everything to one registration.
What we usually walk into
- Progress claims argued from photographs and estimates
- Rework discovered when the following trade cannot start
- Handover models that do not match the building
- Coordination clashes surviving into fabrication
From the field
A commercial fit-out contractor settled a disputed progress claim in two days using registered weekly captures instead of three weeks of photograph forensics.
How the work usually starts here
Construction progress tracking
Compare what was built against what was drawn, weekly.
As-built survey & retrofit
Find the clash in the model, not during the shutdown.
Drone survey & asset inspection
Twelve hectares a day, without anyone on a rope.
Room & interior planner
Design the room, price the room, order the room.
Bring us the product you were told could not be configured.
Tell us the option count, the CAD you already have and the frame budget you need to hit. An engineer reads it and replies with a straight answer — including when the answer is that good photography would serve you better.
We reply to every enquiry within one business day, in your timezone — with a frame budget, not a brochure.